NEWS

Batterie di accumulo Tesla

Prenal ha ottenuto la qualifica di installatore di accumuli Tesla Energy nel 2016. Ora è rivenditore e installatore autorizzato Powerwall. Tesla Powerwall Certified Installer Logo

(Italiano) Il Light Wing System di Pr.En.Al su REPORT

Sorry, this entry is only available in Italian.

(Italiano) Ricarica auto elettriche Pr.En.Al.

Sorry, this entry is only available in Italian.

NEW PROJECTS

Guidonia Montecelio(RM) 141kW

Installation Place: ( )
Install Date:13/08/2012
Installed Power (kWp): 141,00
Avoided CO2 (ton/y)128,48
Avoided NOx (Kg/y)363,62

Realization, Solar System, In Evidenza, Architectural Integration

PV system realized using the Light-Wing System on newly constructed structures.

In this case there is a two meters space in ¬†between the “arms” of the Y beams so two modules are used instead of one.

Trissino(VI) 1,98MW

Installation Place: Trissino ( Vicenza )
Install Date:02/05/2011
Installed Power (kWp): 1.985,14
Avoided CO2 (ton/y)2.385,55
Avoided NOx (Kg/y)6.751,56

Realization, Solar System, In Evidenza, Architectural Integration

1,98 MW PV power system made with the LIGHT-WING SYSTEM.

PV modules are structural components of the coverage .

The stailess steel AISI 304 mounting system is completely waterproof without any polymeric seal.

Vigonza (PD) 99,45 kW

Installation Place: Vigonza ( Padova )
Install Date:24/08/2012
Installed Power (kWp): 99,45
Avoided CO2 (ton/y)89,96
Avoided NOx (Kg/y)254,62

Realization, Solar System, Architectural Integration

PV system on a flat roof with minished mounting system .

Castelfranco(TV) 117kW

Installation Place: Castelfranco Veneto ( Treviso )
Install Date:2012

Realization, Solar System, Architectural Integration

PV system mounted with the Light-Wing System.

FV Vicenza/9

Installation Place: Vicenza ( Vicenza )
Install Date:23/03/2011
Installed Power (kWp): 39,10
Avoided CO2 (ton/y)48,24
Avoided NOx (Kg/y)136,54

Realization, Solar System, Architectural Integration